Two-Stage Pricing Model.

Clarity in Specifications. Certainty in Cost.

Building a home involves hundreds of decisions that directly impact quality, comfort, and cost. At JOHO Life Spaces, we follow a structured Two – Stage Pricing Model to ensure homeowners experience complete transparency, flexibility, and cost control – right from planning to handover.

 1   JOHO Build Packages – Specification based.

Choose your build quality before finalising the cost.

In the first stage, homeowners select a base construction package defined by clear material and execution specifications. This stage helps establish quality expectations and provides an indicative cost range for confident planning.

 

What Stage 1 Includes:

  • Two clearly defined construction packages :

    JOHO Comfort : Starts from Rs.2,169 /Sft
    JOHO Signature : Starts from Rs.2,376/Sft

  • Detailed specifications for structure, finishes, electrical, and plumbing
  • Indicative cost per square foot based on the selected package
  • Early budget clarity for financial planning and loan discussions
    Purpose of Stage 1:

    • Align expectations on quality and scope
    • Avoid unrealistic low-price comparisons
    • Enable informed decision-making before detailed costing

    Stage 1 is meant for specification and budget orientation only and does not represent the final construction cost.

      JOHO Home Construction Packages

      JOHO HOME CONSTRUCTION PACKAGES

      Comfort

      ₹ 2169 / sqft

      Min built up area > 2000 Sft

      Project Management
      Site Engineer: Regular Site Visits
      Project Manager: Visit Site Once in a Week
      Architect Visit: Charges Applicable
      Structural Engineer: Visits the Site at All Key Stages
      Third Party Inspection: Charges applicable for Third party inspections
      Progress Update & Daily Communication: Via R’dash App & WhatsApp Group
      CCTV Camera with LIVE Access
      Written Warranties
      Maintenance Period for workmanship - 1 Year
      Waterproofing Warranty - 3 years
      Antitermite Warranty - 5 years
      Structural Warranty for all structural elements - 15 years
      Design & Drawings
      Architectural 2D Floor Plan with furniture layout for all floors - Yes
      Architectural 3D Elevation - Yes
      Interior works layout plan - Additional Charges Applicable
      3D VIDEO Walkthrough of the home - Additional Charges Applicable
      Digital Site Survey using Total Station @ site - Yes
      SBC Soil Exploration Test @ site - Yes
      Structural Design & Drawings for all structural elements - Yes
      Working Drawings for all floors (Including Stair, Sump, Septic tank & Compound wall) - Yes
      MEP Drawings for all floors - Yes
      Conducting Major Tests
      Bore well Water Quality Test - Yes
      Design mix report - Yes
      Concrete Strength Test for all structural elements - Yes
      Concrete Strength - Rebound Hammer Test
      Flyash Bricks / Wire Cut Bricks - Compressive strength & Water Absorption Tests
      Water bond test- For all toilets & Terrace
      Water Pressure Test for plumbing water lines - For all toilets
      Earth Continiuty Test - For each pits
      Curing for Works
      Footing Concrete - 7 Days
      Column Concrete - 7 Days
      Roof Beam & Slab Concrete Curing - 15 Days
      Brick work along with lintel & sunshades Curing- 7 Days
      Plastering - Internal & External Curing - 7 Days
      Materials Specifications
      Cement - Ramco / Chettinad @ 295 / Bag
      TMT Fe550 - ARS / Vizag Isteel @ 68,000 / MT
      M-Sand for concrete, BW & flooring works - Double Washed M-Sand @ Rs.55 / Cft
      P-Sand for plastering works - Double Washed P-Sand @ Rs.68 / Cft
      Aggregates 20mm, 12mm - Rs.48 / Cft
      Flyash Bricks - Rs.9.00 / No
      Wire Cut Bricks Not applicable
      AAC Blocks 9" & 4" - Mecrete Rs.115.00 / No & Rs.48 / No
      Main Door Entrance Step - Granite @ Rs.120 / Sft
      Parking Floor Tile - Rs.45 / Sft
      Hall / Bedrooms / Kitchen Flooring Tile - Rs.60 / Sft
      Pooja Room - Granite slab for platform - Rs.70 / Sft, Wall tiles are not included
      Balcony / Utility - Rs.50 / Sft
      Toilet Floor & Wall Tile - Rs.50 up to 7' level
      Inner Staircase Step - Full Body Vitrified Tile @ Rs.75 / Sft
      Kitchen Counter Top - Granite @ Rs.100 / Sft
      Kitchen Wall Tile - Rs.50 up to 2' above kitchen platform
      Terrace Flooring Tiles - Heat Proof - Charged additionally
      Tile Grouts with Spacer Joints - Normal grouts for walls & room floors, epoxy grout for bath room floors using MYK - Laticrete
      Main Door Frame & Shutter (Size 3'6" x 7') - 1.5" Thick Teak Door & Frame Worth Rs.35,000.00
      Main Door Fittings - Brass Coated
      Bed Door Frames & Shutters (Size 3' x 7') - Teak Frame & Membrane Door Worth Rs.11000
      Bed Door Fittings - SS or Brass Coated Fittings
      Toilet Door Frame & Shutter (Size 2'6" x 7') - WPC Frame & Shutter Worth Rs.10,000
      Backyard Door - Steel Door (Size 3' x 7') - Additionally charged, if needed
      Windows with 4mm Plain Glass - White color UPVC windows @ Rs.450 / Sft
      Window Grill - 10mm Rod @ Rs.120 / Kg
      Inner Staircase Railing - MS Railing- Rs.500/Rft
      Balcony Railing- MS Railing- Rs.500/Rft
      Paints Brands - Nippon / Berger
      Foundation & Basement
      Foundation Depth (As per Structural drawings) - 5 Feet
      Footing & Plinth Beam Base - PCC (1:4:8)
      Footing Concrete (As per Structural drawings) - M-20 / M25 : RMC
      Footing Protection Cover as per IS Code Norms - Applicable in Water Logging Sites Only
      Column Protection - Dr. Fixit Bitucoating - Applicable in Water Logging Sites Only
      RCC Lift Pit upto FFL & Shafts with BW & Plaster - Additionally Charged
      Plinth Beam Concrete (As per Structural drawings) - M-20 / M25 : RMC
      Column Concrete (As per the Structural drawings) - M-20 / M25 : RMC
      Tie Beam (Applicable if basement height is more than 4'6") - Provided
      Damp Proof Treatment at Basement - 2" to 3" thick DPC at basement level
      Basement Height from Existing Ground Level - 3' Height
      Basement Height for Car Parking from Existing Ground Level - 1'6" Height
      Brick Work Basement with 9" Thick Wall - Flyash Bricks
      Bitumen Coating for Basement Brick Wall (Applicable for Waterlogging Area Only) - Charged Additionally
      Basement PCC - PCC (1:4:8)
      Anti Termite Treatment - Done at Foundation, Basement & Door frame sides
      Compound Wall Construction (if work included in contract) - Tied with Building Plinth Beam
      Superstructure
      Roof Concrete - Grade ( As per the Structural drawings) M-20 / M25 : RMC
      External Wall - 9" Thickness AAC Blocks
      Internal Wall - 4" Thickness AAC Blocks
      Column, Lintel concrete M-20 / M25 : RMC / Machine Mixed
      SILL BEAM below Windows at 3'2 to 3" thick Sill Concrete on all walls
      Reinforcement of Brick Work -4.5" Thick Wall
      • Below Sill Lvl-1Nos
      • Above Sill Lvl-1Nos
      CUT LINTEL BEAM at 7'M-20 : Machine Mixed
      SUNSHADES - 1'6" widthM-20 : Machine Mixed
      LOFTS in Bed Room One Side - 2'0" widthM-20 : Machine Mixed
      LOFTS in Kitchen - L-Shaped - 2'0" width M-20 : Machine Mixed
      Additional Loft Storage above Pooja or Outer Toilet Provided
      ROOF Height - FFL to FFL10'0" Including Slab Thickness
      4" thick Parapet Wall with concrete coping at top 3' 6"Height ; 4.5" Thick Wall
      Ledge wall for incorporating concealed sanitary partsNot Included / Additionally charged
      Sunken Slabs for Toilet (If Required) Provided
      Toilet Water Proofing 2 coats on original concrete surfacesFosroc Brushbond RFX
      Column & Beam joints preparationPillars & Brick; Beams&Brick Joints, Electrical Groves provided with Glass Fibre Mesh
      Ceiling Plastering - 12mm thick 1:3 Cement Plaster Mix
      Internal Wall Plastering - 15mm thick 1:5 Cement Plaster Mix
      External Wall Plastering - 20mm thick 1:5 mix with Waterproofing Admixture Dr.Fixit
      Terrace Water Proofing coats on original concrete surfaces Fosroc Brushbond RFX
      Terrace - Weathering courseCement Flooring Finish over chips concrete 1:4:8
      Internal Ceiling & Wall Putty2 coat Birla Putty + 1 coat Primer
      Internal celing & Wall Painting 2 coats of latest Tractor shine emulsion paint
      Main door polishing works Polished with melamine spray
      Bedroom & Toilet door frames only2 coats of enamel paint
      Grills, safety doors & MS handrails1 coat of primer + 2 coats of enamel paint
      External wall & ceiling Painting1 cost of Primer coat + ace weather proof paint
      Front Elevation Wall Putty - excluding claddin areas, if anyAdditionally charges, if required
      Elevation Works excluding works with cement mortar borders, No Extra Charges
      RCC cover max of 2'x2' size for Inspection chambers at Set back No Extra Charges
      Plumbing & Sanitation Works
      Water supply System - Internal & External - Provided
      Separate bore well & corporation lines, if needed for Kitchens - Additionally charges, if required
      External sewage system – Inspection chambers & sewage outlet to site boundary - Provided
      PLUMBING PIPE - Vertical Lines Fixing - Finolex , Fixed over brackets
      UPVC External Plumbing Pipe material: - Astral Brand
      CPVC Internal Hot Cold Plumbing Pipe material - Astral Brand
      PLUMBING Supply Inside Toilet Provison for metro water & borewell - Additionally charges, if required
      Kitchen Sink 2 Taps - Provision for Metro Water & Borewell Water
      Toilet - Geyser provision - Provided
      Dining Wash Basin Provision - Provided
      CP & SANITARY FITTINGS for this Project inclusive of angle cock, stop cock, WC, Wash basin, Shower & all accessories - Rs.40,000 / 1000 Sft of BUA Parryware/ Jaquar
      CP & SANITARY FITTINGS for this Project - Per Kitchen inlcusive of sink, sink tap and all accessories - Rs.7,000.00 Parryware/ Jaquar
      UV Protected, White Over Head Tank- Tripple Layer - 1000 Litre- 2 No of - Syntex / Ganga Brand
      Corporation Water Inlet Till Site Boundary - Provided
      Pressure Pump -
      Electrical Works
      3 Phase Wiring - 3 Phase
      FRLS Wires - Polycab
      1.5 Sqmm wire - For lights, celing fans, TV, Refrigerators
      2.5 Sqmm wire - For power sockets, AC-1.5T, Microwavens, Washing machines
      4.0 Sqmm wire - For AC-2MT & above, Geysor
      6.0 Sqmm wire - Main Incoming cable
      Switches & Sockets (White Color) - Anchor Roma Classic or Equivalent
      Main DB / MCB Panel Box with 3 Phase Rotary switch - Havells make
      Toilet - Geyser provision - In all Bath Rooms
      AC Provision - In all Bed Rooms
      UPS wiring - Additionally Charged
      DTH , Tv & wifi Cable Conduits Provision - Provided
      ELECTRICAL POINTS & Switch Box on Room Wall - One Switch Box On 3 walls of room as per client's requirement
      Electric Vehicle Charging Provision - Provided
      Dishwasher at Kitchen Provision (If Required) - Additionally Charged
      Solar Provision in Terrace (If Required) - Additionally Charged
      CCTV Piping & Wiring Only - Additionally Charged
      Earthpit - Max of 2 nos provided
      Chemical Earthing pit - Additionally Charged
      Other Works
      Hard rock/soft rock excavation, if needed as per the site conditions - Additionally charges applicable
      SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 6 Feet, any additional depth needed shall be charged as per the soil test report / Structural drawingsAdditionally charges applicable
      Converting 4'5" Wall to 9" Wall - Rs.110/ SftAdditionally charges, if required
      Additional Height for Parapet Wall for 1 FT Rising - Rs.125/Rft (If Required) Additionally charges, if required
      Toilet Nische with tilesAdditionally charges , if required
      Additional Basement Height of 1 Foot:Rs.90/Sft of plot areaAdditionally charges, if required
      Additional Ceiling Height of 1 Foot: s.90/Sft of plot areaAdditionally charges, if required
      Under Ground Water Tank / Sump Rs.16.00 /Litre: FlyAsh Brick workAdditionally charges, if required
      RCC Sump ( 4" Flyash Work + 4" Concrete with 10 mm X 8 mm Single Mat) - - Rs.25.00/Litre Additionally charges, if required
      Septic Tank with flyash brick work - Rs.17.00 /Litre: Additionally charges, if required
      RCC Septic tank 4" Flyash Work + 4" Concrete with 10 mm X 8 mm Single Mat - Rs.25.00/LitreAdditionally charges, if required
      RCC OVER HEAD TANK @ 35' lvl - Rs.30.00/Litre ( Cost of Triple Layer UPVC tanks will be deducted from these charges) Additionally charges, if required
      Nosing, Chamfering for granite flooring, stair worksAdditionally charges, if required
      Granite top at Parapetwall, Window sill & Door sides Additionally charges, if required
      Compound Wall : Pile foundation, plinth & column, 4.5" Thick Solid Block Wall upto 6' from height from GL - Rs.1900 / Rft Additionally charges, if required
      M.S Gate of 10' to 12' WideAdditional charges applicable at actuals
      RampAdditional charges applicable at actuals
      Safety Grill - Main Door & Terrace Doors Additionally Charged at actuals
      Additional Set Back Area for Gravel Filling, PCC Flooring Additionally charges, if required
      Inspection Chambers for Waste Water PlumbingNo Extra Charges
      Gas Cylinder Provision Outside Kitchen-
      Dewatering Pump No Extra Charges
      Solar water heater provision Additionally charges, if required
      Rainwater harvesting facilityAdditionally charges, if required
      Planter Box Outside the Building ( If Required) Additionally charges, if required
      Pergola in Concrete or Steel Fabrication (If Required) Additionally charges, if required
      Glass Works : Toughned Glass / Elevation Glass Works (If Required)Additionally charges, if required
      M.S Steel Staircase to 2nd Floor (or) Head RoomAdditionally charges, if required
      M.S Stand for Drying Cloth in TerraceAdditionally charges, if required
      Washing Stone, Water Supply & DrainageAdditionally charges, if required
      Soak Pit (If Drainage not Provided in Lay-Out) Additionally charges, if required
      Special Elevation Features or Masonry works outside Plinth Area attracts CostAdditionally charges, if required
      Neighbour House IssuesOne Coat Paint or Green Shade Net Provided, if applicable
      Cement Room/ Workers ShedNo Extra Charges
      Any constraints in material delivery or stocking place and materials to be order in small quantitiesThe additional charges for the same shall be charged at actuals

      Signature

      ₹ 2,376 / sqft

      Min built up area > 2000 Sft

      Project Management
      Site Engineer: Regular Visits
      Project Manager: Twice a Week
      Architect: Visits the site at all key stages, Material selection support
      Structural Engineer: Visits the site at all key stages
      Third Party Inspection: Visits the site at all key stages
      Progress Update & Daily Communication: Via R’dash App & WhatsApp Group
      CCTV Camera with LIVE Access
      Written Warranties
      Maintenance Period for workmanship - 1 Year
      Waterproofing Warranty - 3 years
      Antitermite Warranty - 5 years
      Structural Warranty for all structural elements - 15 years
      Design & Drawings
      Architectural 2D Floor Plan with furniture layout for all floors - Yes
      Architectural 3D Elevation - Yes
      Interior works layout plan - Yes
      3D VIDEO Walkthrough of the home - Yes
      Digital Site Survey using Total Station @ site - Yes
      SBC Soil Exploration Test @ site - Yes
      Structural Design & Drawings for all structural elements - Yes
      Working Drawings for all floors (Including Stair, Sump, Septic tank & Compound wall) - Yes
      MEP Drawings for all floors - Yes
      Conducting Major Tests
      Bore well Water Quality Test - Yes
      Design mix report - Yes
      Concrete Strength Test for all structural elements - Yes
      Concrete Strength - Rebound Hammer Test
      Flyash Bricks / Wire Cut Bricks - Compressive strength & Water Absorption Tests
      Water bond test- For all toilets & Terrace
      Water Pressure Test for plumbing water lines - For all toilets
      Earth Continiuty Test - For each pits
      Curing for Works
      Footing Concrete - 7 Days
      Column Concrete - 7 Days
      Roof Beam & Slab Concrete Curing - 15 Days
      Brick work along with lintel & sunshades Curing- 7 Days
      Plastering - Internal & External Curing - 7 Days
      Materials Specifications
      Cement - Ultratech @ 315/ Bag
      TMT Fe550 - SAIL/ JSW @ 75,000 / MT
      M-Sand for concrete, BW & flooring works - Double Washed M-Sand @ Rs.55 / Cft
      P-Sand for plastering works - Double Washed P-Sand @ Rs.68 / Cft
      Aggregates 20mm, 12mm - Rs.48 / Cft
      Flyash Bricks - Rs.9.00 / No
      Wire Cut Bricks - Rs.11.50 / No
      AAC Blocks 9" & 4" - Mecrete - Not applicable
      Main Door Entrance Step - Granite @ Rs.150 / Sft
      Parking Floor Tile - Rs.50 / Sft
      Hall / Bedrooms / Kitchen Flooring Tile - Rs.80 / Sft
      Pooja Room - Granite slab for platform - Rs.70 / Sft, Wall tiles are not included
      Balcony / Utility - Rs.60 / Sft
      Toilet Floor & Wall Tile - Rs.60 up to roof level
      Inner Staircase Step - Granite @ Rs.120/Sft
      Kitchen Counter Top - Granite @ Rs.120/Sftt
      Kitchen Wall Tile - Rs.50 up to 2' above kitchen platform
      Terrace Flooring Tiles - Heat Proof - White Cooling Tile Size 1'X1' @ Rs.40/ Sft
      Tile Grouts with Spacer Joints - Normal grouts for walls & room floors, epoxy grout for bath room floors using MYK - Laticrete
      Main Door Frame & Shutter (Size 3'6" x 7') 1.5" Thick-Teak Door & Frame- Worth Rs.40,000.00
      Main Door Fittings - Full Brass
      Bed Door Frames & Shutters (Size 3' x 7') - Teak Frame & Membrane Door Worth Rs.13000
      Bed Door Fittings - SS or Brass Coated Fittings
      Toilet Door Frame & Shutter (Size 2'6" x 7') - WPC Frame & Shutter Worth Rs.11,500
      Backyard Door - Steel Door (Size 3' x 7') - Additionally charged, if needed
      Windows with 4mm Plain Glass - White color UPVC windows @ Rs.450 / Sft
      Window Grill - 12mm Rod @ Rs.120 / Kg
      Inner Staircase Railing - SS Railing without glass - Rs.800/Rft
      Balcony Railing- SS Railing without glass - Rs.800/Rft
      Paints Brands - Asian / Nippon / Berger
      Foundation & Basement
      Foundation Depth (As per Structural drawings) - 6 Feet
      Footing & Plinth Beam Base - PCC (1:4:8)
      Footing Concrete (As per Structural drawings) - M-20 / M25 : RMC
      Footing Protection Cover as per IS Code Norms - Applicable in Water Logging Sites Only
      Column Protection - Dr. Fixit Bitucoating - Applicable in Water Logging Sites Only
      RCC Lift Pit upto FFL & Shafts with BW & Plaster - Additionally Charged
      Plinth Beam Concrete (As per Structural drawings) - M-20 / M25 : RMC
      Column Concrete (As per the Structural drawings) - M-20 / M25 : RMC
      Tie Beam (Applicable if basement height is more than 4'6") - Provided
      Damp Proof Treatment at Basement - 2" to 3" thick DPC at basement level
      Basement Height from Existing Ground Level - 4' Height
      Basement Height for Car Parking from Existing Ground Level - 2'0" Height
      Brick Work Basement with 9" Thick Wall - Flyash Bricks
      Bitumen Coating for Basement Brick Wall (Applicable for Waterlogging Area Only) - Charged Additionally
      Basement PCC - PCC (1:4:8)
      Anti Termite Treatment - Done at Foundation, Basement & Door frame sides
      Compound Wall Construction (if work included in contract) - Tied with Building Plinth Beam
      Superstructure
      Roof Concrete - Grade ( As per the Structural drawings) M-20 / M25 : RMC
      External Wall - 9" Thickness AAC Blocks
      Internal Wall - 4" Thickness AAC Blocks
      Column, Lintel concrete M-20 / M25 : RMC / Machine Mixed
      SILL BEAM below Windows at 3'2 to 3" thick Sill Concrete on all walls
      Reinforcement of Brick Work -4.5" Thick Wall
      • Below Sill Lvl-1Nos
      • Above Sill Lvl-1Nos
      CUT LINTEL BEAM at 7'M-20 : Machine Mixed
      SUNSHADES - 1'6" widthM-20 : Machine Mixed
      LOFTS in Bed Room One Side - 2'0" widthM-20 : Machine Mixed
      LOFTS in Kitchen - L-Shaped - 2'0" width M-20 : Machine Mixed
      Additional Loft Storage above Pooja or Outer Toilet Provided
      ROOF Height - FFL to FFL10'0" Including Slab Thickness
      4" thick Parapet Wall with concrete coping at top 3' 6"Height ; 4.5" Thick Wall
      Ledge wall for incorporating concealed sanitary partsProvided
      Sunken Slabs for Toilet (If Required) Provided
      Toilet Water Proofing 2 coats on original concrete surfacesFosroc Brushbond RFX
      Column & Beam joints preparationPillars & Brick; Beams&Brick Joints, Electrical Groves provided with Glass Fibre Mesh
      Ceiling Plastering - 12mm thick 1:3 Cement Plaster Mix
      Internal Wall Plastering - 15mm thick 1:5 Cement Plaster Mix
      External Wall Plastering - 20mm thick 1:5 mix with Waterproofing Admixture Dr.Fixit
      Terrace Water Proofing coats on original concrete surfaces Fosroc Brushbond RFX
      Terrace - Weathering courseCement Flooring Finish over chips concrete 1:4:8
      Internal Ceiling & Wall Putty2 Premium Emulsion paint
      Internal celing & Wall Painting 2 coats of latest Tractor shine emulsion paint
      Main door polishing works Polished with melamine spray
      Bedroom & Toilet door frames only2 coats of enamel paint
      Grills, safety doors & MS handrails1 coat of primer + 2 coats of enamel paint
      External wall & ceiling Painting1 cost of Primer coat + ace weather proof paint
      Front Elevation Wall Putty - excluding claddin areas, if anyIncluded excl tiles areas
      Elevation Works excluding works with cement mortar borders, No Extra Charges
      RCC cover max of 2'x2' size for Inspection chambers at Set back No Extra Charges
      Plumbing & Sanitation Works
      Water supply System - Internal & External - Provided
      Separate bore well & corporation lines, if needed for Kitchens - Additionally charges, if required
      External sewage system – Inspection chambers & sewage outlet to site boundary - Provided
      PLUMBING PIPE - Vertical Lines Fixing - Finolex , Fixed over brackets
      UPVC External Plumbing Pipe material: - Astral Brand
      CPVC Internal Hot Cold Plumbing Pipe material - Astral Brand
      PLUMBING Supply Inside Toilet Provison for metro water & borewell - Provided
      Kitchen Sink 2 Taps - Provision for Metro Water & Borewell Water
      Toilet - Geyser provision - Provided
      Dining Wash Basin Provision - Provided
      CP & SANITARY FITTINGS for this Project inclusive of angle cock, stop cock, WC, Wash basin, Shower & all accessoriesRs.50,000 / 1000 Sft of BUA excl carparking - Parryware/ Jaquar
      CP & SANITARY FITTINGS for this Project - Per Kitchen inlcusive of sink, sink tap and all accessories - Rs.9,000.00 Parryware/ Jaquar
      UV Protected, White Over Head Tank- Tripple Layer - 1000 Litre- 2 No of - Syntex / Ganga Brand
      Corporation Water Inlet Till Site Boundary - Provided
      Pressure Pump - Electrical & Plumbing Provision@ Fixing
      Electrical Works
      3 Phase Wiring - 3 Phase
      FRLS Wires - Orbit / Finolex
      1.5 Sqmm wire - For lights, celing fans, TV, Refrigerators
      2.5 Sqmm wire - For power sockets, AC-1.5T, Microwavens, Washing machines
      4.0 Sqmm wire - For AC-2MT & above, Geysor
      6.0 Sqmm wire - Main Incoming cable
      Switches & Sockets (White Color) - Legrand Lyncus or GM Modualr or Equivalent
      Main DB / MCB Panel Box with 3 Phase Rotary switch - Havells make
      Toilet - Geyser provision - In all Bath Rooms
      AC Provision - Hall, Dining and all Bed Rooms
      UPS wiring - Additionally Charged
      DTH , Tv & wifi Cable Conduits Provision - Provided
      ELECTRICAL POINTS & Switch Box on Room Wall - One Switch Box On all 4 walls of room as per client's requirement
      Electric Vehicle Charging Provision - Provided
      Dishwasher at Kitchen Provision (If Required) - Provided
      Solar Provision in Terrace (If Required) - Additionally Charged
      CCTV Piping & Wiring Only - Additionally Charged
      Earthpit - Max of 2 nos provided
      Chemical Earthing pit - Additionally Charged
      Other Works
      Hard rock/soft rock excavation, if needed as per the site conditions - Additionally charges applicable
      SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 6 Feet, any additional depth needed shall be charged as per the soil test report / Structural drawingsAdditionally charges applicable
      Converting 4'5" Wall to 9" Wall - Rs.110/ SftAdditionally charges, if required
      Additional Height for Parapet Wall for 1 FT Rising - Rs.125/Rft (If Required) Additionally charges, if required
      Toilet Nische with tilesProvided
      Additional Basement Height of 1 Foot:Rs.90/Sft of plot areaAdditionally charges, if required
      Additional Ceiling Height of 1 Foot: s.90/Sft of plot areaAdditionally charges, if required
      Under Ground Water Tank / Sump Rs.16.00 /Litre: FlyAsh Brick work - 6000 Litre capacity included
      RCC Sump ( 4" Flyash Work + 4" Concrete with 10 mm X 8 mm Single Mat) - - Rs.25.00/Litre Additionally charges, if required
      Septic Tank with flyash brick work - Rs.17.00 /Litre: Additionally charges, if required
      RCC Septic tank 4" Flyash Work + 4" Concrete with 10 mm X 8 mm Single Mat - Rs.25.00/LitreAdditionally charges, if required
      RCC OVER HEAD TANK @ 35' lvl - Rs.30.00/Litre ( Cost of Triple Layer UPVC tanks will be deducted from these charges) Additionally charges, if required
      Nosing, Chamfering for granite flooring, stair worksAdditionally charges, if required
      Granite top at Parapetwall, Window sill & Door sides Additionally charges, if required
      Compound Wall : Pile foundation, plinth & column, 4.5" Thick Solid Block Wall upto 6' from height from GL - Rs.1900 / Rft Additionally charges, if required
      M.S Gate of 10' to 12' WideAdditional charges applicable at actuals
      RampAdditional charges applicable at actuals
      Safety Grill - Main Door & Terrace Doors Additionally Charged at actuals
      Additional Set Back Area for Gravel Filling, PCC Flooring Additionally charges, if required
      Inspection Chambers for Waste Water PlumbingNo Extra Charges
      Gas Cylinder Provision Outside Kitchen- Provided
      Dewatering Pump No Extra Charges
      Solar water heater provision Additionally charges, if required
      Rainwater harvesting facilityAdditionally charges, if required
      Planter Box Outside the Building ( If Required) Additionally charges, if required
      Pergola in Concrete or Steel Fabrication (If Required) Additionally charges, if required
      Glass Works : Toughned Glass / Elevation Glass Works (If Required)Additionally charges, if required
      M.S Steel Staircase to 2nd Floor (or) Head RoomAdditionally charges, if required
      M.S Stand for Drying Cloth in Terrace1 set Provided
      Washing Stone, Water Supply & Drainage - Provided
      Soak Pit (If Drainage not Provided in Lay-Out) 3' Dia Ring of 5' Depth - 1No's
      Special Elevation Features or Masonry works outside Plinth Area attracts CostAdditionally charges, if required
      Neighbour House IssuesOne Coat Paint or Green Shade Net Provided, if applicable
      Cement Room/ Workers ShedNo Extra Charges
      Any constraints in material delivery or stocking place and materials to be order in small quantitiesThe additional charges for the same shall be charged at actuals

       2   Final Cost – BOQ Based

      Exact cost calculated. Price locked before construction begins.

      Once the base package is selected and architectural, structural, and service drawings are finalised, the project moves to BOQ-based costing.

      At this stage, the final construction cost is derived through a detailed Bill of Quantities, where every item is measured, specified, and priced individually.

      What Stage 2 Guarantees:

      • Item-wise measurement and pricing
      • Complete transparency with no hidden costs
      • Final construction cost locked before execution
      • Cost changes only if the client chooses to modify scope or specifications

      You pay only for what is clearly defined, measured, and approved.

      Customisation Across Packages

      Homeowners are not restricted to a single package.

      If you choose a base construction package but wish to upgrade or modify specific materials, finishes, or components from another package, the same can be fully customised during the BOQ stage.

      How Customisation Works:

      • Base package defines the starting specification
      • Selected upgrades or changes are reflected item-wise in the BOQ
      • Cost impact of each change is shown clearly and transparently
      • No forced package upgrades or bundled pricing

      Choose a base package for clarity. Customise through BOQ for precision.

        Our Commitment

        This pricing model reflects our belief that clarity should come before commitment and certainty should come before construction. By separating specification selection from final costing, we ensure every homeowner builds with confidence and control.